QUESTIONS ABOUT THE PROPOSED ELEMENTARY
<<<<< CLICK ON LINKS TO THE LEFT, UNDER HEADLINES TO NAVIGATE TO BOND TOPICS
1. How many square feet is in the proposed new elementary?
- 76,250 sq. ft
2. What is the average cost to build a new elementary in the state of Texas?
- This question is difficult to answer as reports from the State Comptroller's Office are several years old and out-of-date. As source information becomes available, it will be posted to this question.
- The numbers used for the building estimate came from actual bid information (square foot costs) of current projects the District's architectural firm is working on along the gulf coast. The architect has conservatively estimated the price to include increased material costs at the time of actual construction.
3. How did the District select the architect for this project?
- There is a specific legal process for a school District to select an architectural firm. This process requires the posting of a Request for Qualifications (RFQ). The superintendent personally invited every architect attending the annual Texas Association of School Administrator's Mid-Winter Conference to apply. Respondents are judged based on a set of criteria and reference checks. The candidate(s) are brought before the Board of Trustees for approval, which includes the architect meeting with the Board of Trustees for a type of interview with the Board.
- The Board of Trustees selected Architects Rabe+Partners based on some of the following criteria:
- Experience in school architecture.
- Experience working with small schools (this firm specializes in small school design).
- Reputation in the industry.
- Repeat business by districts using the firm (this firm has been working with several districts as their sole architectural firm for 20-30 years).
- For examples of Architects Rabe+Partners work, please visit their website at: archrabe.com
4. Why did it take so long to complete the second floor of the middle school?
- When the bond was passed for the construction of the middle school, the plan was to build a two-story structure with the upper story as an empty shell. The building was designed with space for an additional HVAC system, an elevator, mechanical room, and plumbing for restrooms. By doing this, the expansion of the facility to include the second floor saved the district a substantial amount of taxpayer dollars versus extending the building's footprint as a one-story structure.
- Once the space was needed, the district used funds saved over the years in the district's fund balance as well as funds from the TRE that passed previously to pay for the second floor.
- The delay in construction was due to limited manpower in this area to construct facilities because of the construction needs in the Houston and surrounding areas. In addition, a delay of several months occurred because the electric company tasked with setting a new transformer had been contacted in June for a fall installation. They were unable to set the transformer until after Spring Break. This delay had a domino effect on the rest of the construction wrap-up. Students were not able to get into the facility until the last few weeks of the school year; however, the 2017-18 school year started with sixth-grade classes upstairs.
5. Do we have bids that can be reviewed for the proposed elementary school?
- The proposed elementary school project will not be bid unless the bond passes. Cost estimates for this project are from our architectural firm who specializes in small school design and construction.
6. Where will the new playground be located?
- Two locations are being considered. One possible location is behind the proposed new elementary instructional wings near the residential area and the second location is between the proposed new elementary and the tennis courts/transportation building.
7. What security and safety features will be in the new elementary?
- Two main security features are part of the new design which are not a part of the current elementary school. These features relate to building access and fire safety.
- The proposed elementary school will have one main point of entry with an airlock entry system (double door entry) where visitors will have to check in at the office prior to being allowed into the main part of the building. The building has been designed so portions of the facility may be used while limiting access to other locations. The library, cafetorium, and gymnasium will be accessible for building use after hours as scheduled while keeping academic wings inaccessible to visitors after hours. All elementary classrooms and building features can be accessed from inside the building without requiring students to travel outside to get to another portion of the building.
- In addition, the proposed building will have a fire sprinkler system and a fire alarm system throughout the facility. In the event of a fire, the HVAC system will shut down to prevent the spread of smoke throughout the facility.
8. Does the plan include paving the gravel road that runs in front of the proposed elementary?
- Funds have been set aside in the bond package for drives, sidewalks, and parking lots. Specifics regarding the gravel road have not been completed; however, the road will need to have some type of paving.
9. Will the old school be demolished?
- The current bond proposal does not fund demolition or renovation of the current elementary school; however, the Board of Trustees has committed themselves to spending funds, as available, to demolish portions of the current school and renovate other sections. If money remains from the bond after bids are completed for construction, available funds may be used to speed up the demolition and renovation projects.
- Plans for the existing elementary school include:
- Demolishing the Primary Wing.
- Renovating the auditorium and converting the cafeteria into a lobby. ADA accessible restrooms will be installed in the new lobby area.
- Demolishing the current Grade 4 and 5 portion of the long hallway (1952 edition).
- Renovating the gym and restroom area.
- Renovating and repurposing the newer section of the long hallway (possible uses have been discussed, but no final decision has been made): Administration building, Career and Technical Building, Fine Arts Building, etc.
- Demolish the 4 classroom building.
- The current library and bandhall buildings are being reviewed. Eventually, the District would like to move the band to the same side of the street as the high school; however, it has also been discussed that renovation on the elementary library to convert it to a bandhall might be explored. No final decision has been made.
- Areas where demolition occurs will have parking added to it.
10. If we had a budget deficit in previous years, how can the district afford to spend $150,000 a year from the general fund to offset a tax increase?
- The budget deficit from 2015--16 was a purposeful, structural deficit. The deficit was because of a temporary reduction of the Interest and Sinking (I&S) rate to reduce the tax rate for the local taxpayer and to use "excess" I&S collections from previous tax years. I&S collections can only be used to pay existing debt. By proposing a lower tax rate temporarily, the district set a deficit budget that forced the district to spend the "excess" I&S funds that can only be used to pay the debt.
- The district tends to spend less than the proposed budget through careful management of funds.
- In addition, during the 2017 legislative session, the legislature passed a bill revoking the small district adjustment (also known as the small school penalty). This penalty provided less funding for districts with less than 1,600 students or less than 300 sq. miles. It has been in place for 35+ years. This penalty represents approximately $785,000 per year less that Danbury ISD received versus districts with 1,600+ students or more than 300 sq. miles. It will be phased in over a 5-6 year period providing a little over $130,000 more per year until the district receives the full funding amount.
11. Does the elementary garden go away in the proposed plans?
- No. The elementary garden will remain where it is and is not affected by the bond plans. This is an important feature and teaching tool for the elementary school. Designs for the new elementary school took this feature into account when plans were developed.
12. Who were the committee members and how were they selected?
- The building committee was selected by the Board of Trustees to study the needs of the district and to determine if there was a need for the District to call a bond to allow a vote for new or renovated facilities.
- The committee was made up of business representatives, community members, parents, and school personnel.
- The members started meeting last fall and have continued to meet on and off through August of this year when the bond was called.
- Not all members stayed on the committee throughout the year-long process.
- Members included: Bill Turnipseed, David Catoe, April Williams, Kay Harrison, Dory Mitchell, Celia Lewis, Jarrod Smith, Steve Thompson, Gerald Peltier, David Smith, Will Garrett, Derrick Dees, Clint Peltier, Disa Schulze, Daryl Peltier, Kristi Jones, Alicia Neubauer, Rhonda Wendel, Ace Filipp, and Greg Anderson.
13. What is the change in the number of classrooms, teachers, and maximum student capacity of the proposed elementary?
- The proposed elementary school will add one additional classroom per grade level for an additional 6 classrooms.
- The maximum capacity of the elementary school will be 600 students at full capacity for each classroom.
- Teachers are hired on an as-needed basis. DISD will not hire additional teachers to fill space, but only as classroom capacity and student needs dictate. Some grade levels are near the maximum student-teacher ratio as dictated by the Texas Education Agency. If the number of students exceeds TEA standards, the district either has to get a waiver from the state or hire an additional teacher for that grade level.
14. What does this increase do to the Maintenance and Operations (M&O) side of the budget?
- The Maintenance and Operations (M&O) portion of the budget will need to increase as personnel are added to the staff; however, since the legislature has revoked the small district adjustment penalty, beginning next year the district will receive an additional $130,000 per year. This increase will continue for the next several years until Danbury ISD receives the full $785,000 per year that DISD has been penalized for being a small school.
- The electrical efficiency of a new facility, along with a new five year lower electric contract, will also reduce costs and free money for the Maintenance and Operations (M&O) portion of the budget once renovations/demolition of existing facilities occurs.
- Careful management of the Limited Open Enrollment (LOE) program helps the district capitalize on adding enough students to pay for existing staff but limiting enrollment to reduce the need for hiring staff unnecessarily.
15. Is there a plan for renovating and replacing other school facilities and structures?
- There is not a firm and fast timeline for renovation and replacement of other school facilities and structures; however, as a part of the planning process for this bond, a master facilities plan was developed.
- The first phase of the plan called for completion of the second floor of the middle school. That project was completed in April 2017.
- The second phase calls for the construction of a new elementary school. The bond is set for November 7, 2017.
- The third phase will be the renovation of the high school. (There are several smaller maintenance and renovation projects prior to the full renovation of the high school).
- Continual monitoring of the roofing system, HVAC system, flooring, and other facilities is ongoing and repairs and renovations are made as the needs arise.
16. Are we trying to become a STEAM campus?
- The district has been increasing the number of Science, Technology, Engineering, Arts, & Mathematics (STEAM) options to all of its campuses for the last few years. This proposed facility will have a dedicated maker space area (where STEAM projects can be performed), a science lab, and an art/music room. The elementary currently works with students through robotics and has a strong science and math program.
17. What other funding sources did the committee consider?
- The primary funding source as designed by the state is the passage of bonds by local taxpayers for new construction.
- Federal grants do not fund new facilities.
- The state only provides a small fraction of the funding for new facilities.
- Most businesses are not going to provide funding for school construction.
- The District cannot save enough money in fund balance to finance a new school.
18. Did the District refinance the current debt to keep the Interest and Sinking (I&S) rate below a certain number?
- Bonds have certain time limits in which they can be refunded (the equivalent of refinancing a mortgage). The current debt on the middle school was refunded in the fall of 2015 which reduced the interest rate of the current bond from 4.18% to an average interest rate yield of 2.03%. The District was able to save the taxpayers $406,158 in interest cost over the remaining life of the bonds, which results in an average annual savings of $28,646. We are not able to refund the existing bonds again prior to their expiration.
19. Are furnishings and technology included in the bond money?
- The bond does not include money for most portable furnishings or technology. Items that are built in or are part of the technology infrastructure are part of the bond. It would be impractical to pay for furnishings and technology using bond money that will be financed for 30 years when most of these items have a usable lifespan that is less than the 30 years. These items would be paid for using Maintenance and Operations (M&O) funds or would be moved from the existing elementary to the new elementary school.
20. Would there be a chance that high school or middle school students would use the elementary building?
- Because of the size and proximity of district facilities, all campuses have access to other district buildings as needed and as judged in the best interest of the students.
- For example, within the last few years, we have had elementary students use the middle school computer lab when there was a scheduling conflict in their building and middle school students have used the elementary gym for basketball practice.
- In the proposed elementary, the gymnasium/multipurpose area will be built to meet UIL size requirements for basketball; however, the seating is limited in this facility as it is designed as an elementary area and not as the main gymnasium for the district. It does give an option should the existing elementary gym become unavailable, although the existing elementary gym will remain the main practice area for middle school students. Additionally, the cafetorium stage will be designed to meet the UIL One-Act Play stage requirements. It will be the only stage in the district that meets that standard; however, the cafetorium is primarily an elementary venue.
- If the question is, "Will the high school or middle school take over the elementary school at some point?", the answer is no. The proposed elementary school classroom space is designed to meet the Texas Education Agency standards for elementary instructional space. The middle school and high school TEA space requirements are different. The primary purpose of the proposed elementary school is for ELEMENTARY use.
21. Will the glass depicted in the drawings of the elementary school present a problem living along the gulf coast?
- The pictures of the elementary school depicted in drawings and the video are concept drawings. The actual building design may vary once the building is complete.The Board of Trustees can always work with the architect to redesign the entrances to the school if they feel this will present a problem.
- All windows in new school construction must meet current windstorm standards and must be impact resistant glass. Even broken windows replaced in the District's current facilities must be replaced with impact resistant glass.
- The District's architectural firm has designed and supervised the building of facilities along the gulf coast with glass along the front of the building. One such structure in Matagorda County recently survived Hurricane Harvey without damage.
22. Is there a designated area for the Preschool Program for Children with Disabilities (PPCD)?
- Yes. There is a classroom designated as the PPCD classroom.
23. What will the school name be?
- Danbury Elementary School.
24. Is there anything hiding in the bond proposal?
- No. The bond proposal is for an elementary school. The bond proposal is a conservative estimate of costs and estimated interest rates. If bids come in lower than anticipated or all funds are not used in the construction of the elementary school, the Board of Trustees stated they plan to use those funds to speed up the demolition and renovation/repurposing of the existing elementary facilities and building of parking spaces.
25. How can voters stay more informed on decisions made by the school?
- The Board of Trustees meets once a month, usually on the third Monday of the month (unless that date is a school holiday). The Board of Trustees meeting schedule is posted on the district website each September for the remainder of the school year.
- Information regarding the bond program has been discussed either in special presentations or during the facilities update section of the Board of Trustee meetings for the past year. In addition, THE FACTS has occasionally reported on the district's efforts to work on the district's master facilities plan and elementary design.
- The bond was called during the August 21, 2017 Board of Trustees meeting (just prior to Harvey).
- Informational brochures were made available at the Project Grad spaghetti supper and the concept video was shown. In addition, these items were also made available at the Danbury v.Tidehaven football game (and will also be available at the next two varsity home games).
- Building tours of the current elementary school and completed middle school and informational brochures will be available on:
- Thursday, October 12, 2017, from 6:00 PM-7:30 PM
- Thursday, October 19, 2017, from 6:00 PM-7:30 PM
- Tuesday, October 24, 2017, from 4:30 PM-6:00 PM
- The District will also mail informational material and send alerts in the coming days.
26. Why doesn't Danbury ISD receive tax money from INEOS like Angleton ISD and Alvin ISD?
- The INEOS plant lies within Angleton ISD and Alvin ISD; therefore, they pay taxes to those two taxing entities.